Geovision GV-MOUNT100 Manual De Usuario
Installing the Fixed IP Dome
93
3
2. Assemble the mounting bracket (GV-Mount400 / GV-Mount410, No. 1) and the junction
box (GV-Mount203, No. 1) from the backside using 25 mm M8 screws (GV-Mount400 /
GV-Mount410, No. 4), plain washer (GV-Mount400 / GV-Mount410, No. 5) and split
washers (GV-Mount400 / GV-Mount410, No. 6).
Backside View
3. Secure the mounting bracket to the pole using 3 steel straps (GV-Mount400 / GV-
Mount410, No. 2). Rotate the screw on the strap to adjust its size. Face the conduit exit
downward.
4. Assemble the corrugated tube connector (GV-Mount203, No. 4) with the self-prepared
corrugated tube.
A. Dismantle the supplied corrugated tube connector. You should have 4 parts.
A B
C
D
B. Slide part A and part B to the self-prepared corrugated tube.
A+B
C
D
C. Screw part C to the tube.