Bk Precision BK-5492B Digital-Multimeter, DMM, BK-5492B Hoja De Datos

Los códigos de productos
BK-5492B
Descargar
Página de 111
Overview 
18 
 
2.6    Power up 
2.6.1    Power Line Connection 
 
CAUTION:  Operating the instrument on an incorrect line  voltage may cause damage to the 
instrument, possibly voiding the warranty. 
 
BEFORE
 connecting the 5492B multimeter to a power line, please check that the correct fuse is 
in place, and the fuse box inside the fuse holder is adjusted correctly.    See section 
  for 
details. 
 
Follow the procedure below to connect the 5492B to line power and turn on the instrument. 
1.  Check  the  line voltage and be sure it is within the acceptable range of the meter BEFORE
2.  Check the fuse box position inside the fuse holder to make sure it is in the correct position that 
corresponds to the line voltage the unit will be connected to.    The fuse holder will have a selected 
voltage label on the front to indicate the selected voltage tab for operation.  Change the fuse box 
position to change between 110 and 220.    If you’re not sure, see sectio
 
connecting into the AC input in the rear panel of the instrument.  Applying an incorrect voltage 
may cause damage to the instrument and void its warranty. 
1.2      for details. 
3.  Check that the correct line fuse is properly inserted into the fuse box.    The fuse rating between 
110V and 220V operation is different.    Refer to section 1.2      for details. 
4.  Before plugging in the power cord, make sure that the front panel power switch is in the off (out) 
position. 
5.  Connect the female end of the supplied power cord to the AC input on the rear panel. Connect the 
other end of the power cord to a grounded AC outlet. 
     
WARNING: The power cord supplied with the Model 5492B contains a separate ground wire for 
use with grounded outlets. When proper connections are made, instrument chassis 
is connected to power line ground through the ground wire in the power cord. Failure 
to use a grounded outlet may result in personal injury or death due to electric shock. 
 
6.  Turn on the instrument by pressing the front panel power switch.   
 
2.6.2    Power-up Sequence 
On power-up, the multimeter performs self-tests on its EPROM and RAM and lights all segments and 
annunciators for about 1 second.  If a failure is detected, the instrument momentarily displays an error 
message and the ERR annunciator will turn on.   
 
If the instrument passes self-tests, the firmware version and the model number will display momentarily 
before it is ready for use.