Atmel Evaluation Kit AT91SAM9X25-EK AT91SAM9X25-EK Hoja De Datos

Los códigos de productos
AT91SAM9X25-EK
Descargar
Página de 95
Evaluation Kit (EK) User Guide
3-1
11115A–ATARM–27-Jul-11
Section 3
Power Up
3.1
Power Up the Board
Unpack the board taking care to avoid electrostatic discharge. Unpack the power supply, select the right
power plug adapter corresponding to that of your country, and insert it in the power supply.
Connect the power supply DC connector to the board and plug the power supply to an AC power plug.
The board LCD should light up and display a welcome page. Then, click or touch icons displayed on the
screen and enjoy the demo.
3.2
DevStart
The on-board NAND Flash contains an installation guide named: “SAM9x5-EK DevStart”.
It is stored in the “SAM9x5-EK DevStart” folder on the USB Flash disk available when the Evaluation Kit
is connected to a host computer.
Click the file “welcome.html” in this folder to launch the SAM9x5-EK DevStart.
DevStart guides the user through the installation processes of IAR™ EWARM, Keil™ MDK and GNU
toolkits. Then, it gives step-by-step instructions on how to rebuild a single example project and how to
program it into the Evaluation Kit. Optionally, if the user has a SAM-ICE™ interface, instructions are also
given about how to debug the code.
It is strongly recommended that users backup the “SAM9x5-EK DevStart” folder on their com-
puter before launching it.