A. Indoor Installation of the Floor Temperature Control System 
 
A. 1. Floor construction notes 
 
We  recommend  to  always  follow  the  manufacturer’s  instructions  for  the  materials  used  (adhesive,  levelling 
material,  insulation  material,  etc.).  Generally,  only  flexible  tile  adhesives,  levelling  material,  etc.  suitable  for 
under-floor heating are to be used.  
The  heat  transmission  resistance  of  the  floor  construction  above  the  heating  cable  should  be  as  low  as 
possible.  
In  order  to  prevent  heat  and  energy  loss  to  the  sub-floor  and,  therefore,  to  ensure  optimum  heating  of  the 
floor covering, the under-floor design must incorporate state-of-the-art technology.  
For optimum contact with the sub-floor we recommend applying a priming layer before installing the heating 
cable. 
 
Recommended products:    
By  way  of  providing  typical  examples,  we  offer  below  suggestions  for  the  use  of  products  supplied  by  the 
manufacturers PCI Augsburg GmbH, Piccardstraße 11, 86159 Augsburg. Naturally, similar products supplied 
by other manufacturers (e.g. Ardex, Knauf, etc) are equally suitable. However, please follow the instructions 
provided by the individual suppliers. 
 
  Laying tiles and other ceramic floor products on a screed  
Apply the adhesive (e.g. "PCI-FlexMortel")  onto the screed using a 6-mm-toothed spatula. Embed 
the heating element into the mortar with the heating cable underneath.. Apply more adhesive using a 
10-mm-toothed spatula. Place the tiles or other ceramic floor material in position.  
 
  Laying natural stone products on  the screed: 
Proceed as described above but use, e.g. "PCI-Carraflex" as the adhesive. 
 
  Laying soft materials such as carpets, PVC, parquet blocks, etc. on the screed: 
Apply  the  adhesive  (e.g.  "PCI-FlexMortel")    onto  the  screed  using  a  6-mm-toothed  spatula.  Embed 
the  heating  element  into  the  mortar  with  the  heating  cable  underneath.  When  this  has  hardened, 
apply a universal filler mass such as PCI-USP32 in a layer which is at least 5 mm thick. When this 
has hardened, the particular soft floor covering can be put in place using an adhesive (typically Textil-
Belagskleber(Textile-covering material adhesive) PCI-TKL315, PVC-Belagskleber (Covering material 
adhesive)  PCI-PKL324,  Linoliumkleber  (Linolium  adhesive)  PCI-LKL334,  Korkkontaktkleber  (Cork 
contact  adhesive)  PCI-KKL347,  Parkettkleber  (Parquet  Block  adhesive)  PCI-PAR354,  etc.)  -  i.e. 
adhesives specially prepared for the floor covering being used.  
 
  If it is necessary to level the floor because of surface irregularities:  
we recommend the readily-flowing screed levelling material "PCI-Periplan" applied as a layer 4 - 5 
mm thick. This can be followed by the laying activity using PCI-Flexmortel as described above. 
 
  For filling joins between tiles or other ceramic floor materials we recommend: 
"PCI-Flexfuge". Finally, wall gaps and expansion joints can  be filled  with the elastic material "PCI-
Silcoferm-S" 
 
  For filling joins between natural stones we  recommend: 
"PCI-Carrafug" or "PCI-Carrafern" 
 
  Preliminary treatment required when laying upon a solid wooden floor base:  
Remove all dust and other forms of soiling, close the cracks in the floor with "PCI-Adaptol" and apply 
an adhesive primer such as "PCI-Flächengrund-404". When this has dried out  apply a levelling 
compound such as "PCI-Periplan". After this, too, has dried out the covering material may be applied 
as described above. Under no circumstances may the heating elements be laid over movement joins.  
 
  Preliminary treatment required when laying upon a chipboard base: 
Remove all dust and other contamination, prime with "PCI-Wadian" and allow to dry. Then proceed to 
lay the selected floor covering as described above. The chipboard slabs must be at least 25 mm thick 
and must be secured to the sub-floor by screws spaced no more than 40 cm apart.  
Under no circumstances may the heating elements be laid over movement joins.