HP Performance Optimized Data Center (POD) 20cp Guía De Instalación Rápida

Descargar
Página de 38
 
Index  38 
site planning considerations   23 
site preparation   6 
site preparation checklist   29 
site requirements   8, 22 
storage locations   24 
supported facility connections   16 
system capacity   7 
U 
utilities   12 
V 
vestibule specifications   25 
W 
warranty information   33 
water supply   12 
weight   8 
Z 
zoning and permit requirements   22