Bunn SILVER SERIES JDF-2S Manual De Usuario

Descargar
Página de 24
24
1. Install door cover by first plugging the 
door harness connector into the machine 
harness  connector  located  at  the  bottom 
of the machine door.
2. Install door cover.
3. Secure the door cover using 5 screws 
provided.
4. Place refrigeration switch in the OFF po-
sition.
5. Connect water supply to machine. (See 
Plumbing Requirements)
6. Connect power supply to machine. (See 
Electrical Requirements)
7. Install bath tank fill tube over a nozzle as 
shown.(See Initial Fill)
8. Place the 
Dispense Lockout
 switch 
in the OFF position.
9. Hold the dispense switch until water be-
gins to flow into the tank (approx. 10 sec-
onds). When tank is full, water will begin 
pour  out  of  the  overflow  tube,  Press  the 
dispense button to stop the flow of water.
10. Place the refrigeration switch in the ON 
position.
11. Insert juice containers as shown.
12. Proceed to page 7 in the Operating and 
Installation manual for calibration instruc-
tions and charts.
QUICK SETUP GUIDE
P3577
P3578
P3579
P3587-1
P3580-1
P3588
P3591
P3590-1
P3582
P3589
P3612
38945 050106