Bunn VP-17 1, 2, 3 (220 Volt) Manual De Propietario

Descargar
Página de 8
Page 4
ELECTRICAL REQUIREMENTS
CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.
 
The 120V brewer has an attached cordset and requires 2-wire grounded service rated 120 volts ac, 15 amp, 
single phase, 60 Hz.
46720  051013
"A"  models require 2-wire, grounded service rated 220 - 240 volts ac, 15 
amp, single phase, 50/60 Hz. An all pole disconnect means must be incorporated 
in the fixed wiring according to local wiring regulations.  Proceed as follows:
CE REQUIREMENTS
• This appliance must be installed in locations where it can be overseen by trained personnel.
• For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C.
• Appliance shall not be tilted more than 10° for safe operation.
• An electrician must provide electrical service as specified in conformance with all local and national codes.
• This appliance must not be cleaned by water jet.
• This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental 
capabilities, or lack of experience and knowledge, unless they have been given instructions concerning use of 
this appliance by a person responsible for its safety.
• Children should be supervised to ensure they do not play with the appliance.
• If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personnel 
with a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard.
• Machine must not be immersed for cleaning.
Electrical Hook-Up (Model "B" Only)
CAUTION – Improper electrical installation will damage electronic components.
1.  An electrician must provide electrical service as specified.
2.  Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3.  Place the heater switch, located on  the left front of the control panel on "B" Models, in the "OFF" (lower) 
position.
4.  Remove the front panel beneath the sprayhead.
5.  Feed the cord through the strain relief and connect it to the terminal block.
6.  Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.  Re-
place the front panel.
"B"  models require 2-wire, 
grounded service rated 100 volts 
ac, 20 amp, single phase, 50 Hz. 
Proceed as follows:
100V.A.C.
WHITE
NEUTRAL
L1 BLACK
P2185
220-240V A.C.
L2 RED
N WHI
L1 BLK