Bunn VLPF Manual De Propietario

Descargar
Página de 28
Page 4                                    
ELECTRICAL REQUIREMENTS
CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.
 
The brewer has an attached cordset and requires 2-wire, grounded service rated 120 volts ac, 15 amp, single 
phase, 60 Hz.
PLUMBING REQUIREMENTS
  This brewer must be connected to a cold water system with operating pressure between 20(138) and 90 
psi(620 kPa) from a 1/2” or larger supply line.  A shut-off valve should be installed in the line before the brewer.  
Install a regulator in the line when pressure is greater than 90 psi(620 kPa) to reduce it to 50 psi(345 kPa).  The 
water inlet fitting is 1/4” flare.
NOTE - Bunn-O-Matic recommends 1/4” copper tubing for installations of less than 25 feet and 3/8” for more 
than 25 feet from the 1/2” water supply line.  A tight coil of copper tubing in the water line will facilitate moving 
the brewer to clean the counter top.  Bunn-O-Matic does not recommend the use of a saddle valve to install the 
brewer.  The size and shape of the hole made in the supply line by this type of device may restrict water flow.
Plumbing Hook-Up
1.  Attach the female fitting from the short piece of tubing on the flow control/strainer assembly (supplied) 
to the water inlet fitting on the right rear side of the brewer.
2.  Flush the water line and securely attach it to the flare fitting on the flow control/strainer assembly.
3.  Turn on the water supply
OPERATING CONTROLS
A.  On/Left Switch
 
Placing the switch in the upper position supplies power to the left decanter warmer and enables brewing and 
refilling of the tank.  Placing the switch in the lower position cuts power to the left decanter warmer and stops 
brewing and refilling of the  tank.  Stopping a brew cycle after it has been started will not stop the flow of water 
into the funnel until the tank syphons down to its proper level.
NOTE -  The On/Left switch must be in the upper position to initiate and complete a brew cycle or to automatically 
refill the tank after using the hot water faucet.
B.  Start Switch
 
Starts a brew cycle when the On/Left switch is in the upper position.
C.  Right Switch
 
Placing the switch in the upper position supplies power to the right decanter warmer.  Placing the switch in 
the lower position cuts power to the right decanter warmer.
10179 051712
As directed in the International Plumbing Code of the International Code Council and the Food Code Manual 
of the Food and Drug Administration (FDA), this equipment must be installed with adequate backflow pre-
vention to comply with federal, state and local codes. For models installed outside the U.S.A., you must 
comply with the applicable Plumbing /Sanitation Code for your area.