Bunn Ultra-2 Manual De Usuario

Descargar
Página de 19
17
1.  Install the seal(s) over the flange at 
the rear of the cooling drum(s) and 
press the seal(s) firmly into place 
as shown.
2.  Align the auger shaft(s) with the 
auger(s). Push the auger(s) as far as 
they will go and rotate so the flat face 
of the auger shaft is aligned with the 
flat face of the auger nose.
4.  Thoroughly rinse the hopper(s) 
and install over the auger(s) and 
cooling drum(s).
6.  Set the lids on the hopper(s) 
and plug in the hopper lid lamp 
cord(s).
10. Assemble the drip tray.
8.  Slide the faucet valve assembly into 
place on the hopper.
9.  Press down on the valve to com-
press the spring. Position the faucet 
handle over the faucet valve one 
side at a time and snap into place 
on the hopper.
7.  Position the faucet seal and return 
spring in the faucet valve.
5.  Slide into place and push down until 
the hopper lock plunger(s) snap 
into place. On models with autofill, 
reconnect fill hoses and level probe 
to hopper.
ASSEMBLY FOLLOWING CLEANING
3.  Install auger nose bushing into 
inside front of hopper.
11. Turn ON augers and cooling function 
to desired settings.
45246 072611