Bunn 1 GPR, 1/5 GPR, 1/75 GPRCanada Manual De Propietario

Descargar
Página de 12
Page 8
FIG. 3 CONTROL THERMOSTAT 
CONTROL THERMOSTAT
SERVICE
 
This section provides procedures for testing 
and replacing various major components used in 
this brewer should service become necessary.  Refer 
to Troubleshooting for assistance in determining the 
cause of any problem.
WARNING - Inspection, testing, and repair of electri-
cal equipment should be performed only by qualified 
service personnel.  The brewer should be disconnected 
from the power source  when servicing, except when 
electrical tests are required and the test procedure 
specifically states to plug-in the brewer.
COMPONENT ACCESS
WARNING
 - Disconnect the brewer from the power 
source before the removal of any panel or the replace-
ment of any component.
  All components are accessible by the removal of 
the top cover and fill basin.
  The top cover is attached with two #4-40 
screws.
   
 
Contents
Control Thermostat ................................................9
Limit Thermostat ..................................................10
Tank Heater ......................................................... 10 
Wiring Diagrams ................................................. 12
P2412-1
  The tank inlet fitting secures the fill basin to the 
tank lid
.
P2413
FIG. 2 FILL BASIN REMOVAL
FIG. 1 COMPONENT ACCESS
P2414
39064 042806