Harbor Freight Tools 2575 Manual De Usuario

Descargar
Página de 23
SKU 02575 
for technical questions, please call 1-800-444-3353. 
Page 8
Align the mounting hole located at each end of the Rear Cross Member (3) with 
the mounting hole located in the end of the Right Side Rail (1R) and the end of the 
Left Side Rail (1L).  On each end insert one 3/8” x 7/8” Carriage Bolt (A) 
upward 
from the underside of the aligned mounting holes, and secure the Rear Cross 
Member to the Right Side Rail and Left Side Rail with one Washer (C) and one Nut 
(B).  
(see figure A.)
Align the four mounting holes located at the middle and rear sections of the Tow 
Bar (9) with the four mounting holes located in the middle section of each of the 
two Cross Members (2).  Insert four 3/8” x 7/8” Carriage Bolts (A) 
upward from the 
underside of the aligned mounting holes, and secure the Tow Bar to the two Cross 
Members with four Washers (C) and four Nuts (B).  
(see figure A.)
Align the three mounting holes located in the Right Connecting Rail (8) with the 
one
 mounting hole located in the Right Side Rail (1R), one mounting hole located 
in the forward Cross Member (2), and one mounting hole located in the Tow Bar 
(9).  Insert three 3/8” x 7/8” Carriage Bolts (A) 
upward from the underside of the 
aligned mounting holes, and secure the Right Connecting Rail to the Right Side 
Rail, forward Cross Member, and Tow Bar, with three Washers (C) and three Nuts 
(B).  
(see figure A.)
Align  the  three  mounting  holes  located  in  the  Left  Connecting  Rail  (7)  with  the 
one mounting hole located in the Left Side Rail (1L), one mounting hole located 
in the forward Cross Member (2), and one mounting hole located in the Tow Bar 
(9).  Insert three 3/8” x 7/8” Carriage Bolts (A) 
upward from the underside of the 
aligned mounting holes, and secure the Left Connecting Rail to the Left Side Rail, 
forward Cross Member, and Tow Bar, with three Washers (C) and three Nuts (B).  
(see figure A.)
Insert the Coupler (12) onto the forward end of the Tow Bar (9), and align the two 
mounting holes in the Coupler with the two mounting holes in the Tow Bar.  Secure the 
Coupler to the Tow Bar, using two Bolts (V) and two Nuts (B).  
(see figure A.)
To Attach the springs, Tires, Wheels, and Axle to the frame:
Align the two mounting holes in a Front Spring Hanger (15F) with the two mounting 
holes located in the forward section of the Left Side Rail (1L).  Insert two 3/8” x 7/8” 
Carriage Bolts (A) 
upward from the underside of the aligned mounting holes, and 
secure the Front Spring Hanger to the Left Side Rail with two Washers (C) and two 
Nuts (B).
Align the two mounting holes in the remaining Front Spring Hanger (15F) with the 
two mounting holes located in the forward section of the Right Side Rail (1R).  In-
sert two 3/8” x 7/8” Carriage Bolts (A) 
upward from the underside of the aligned 
mounting holes, and secure the Front Spring Hanger to the Right Side Rail with two 
Washers (C) and two Nuts (B).
4.
5.
6.
7.
8.
1.
2.