GSI Outdoors Commercial Direct Gear Drive Bin Sweep Auger PNEG-1521 Manual De Usuario
INSTALLATION
27
PNEG1521 Commercial Direct Gear Drive Bin Sweep Auger
A. Attach the UJoint to the Centerwell Gearbox Shaft
using a ¼” x 1¼” Square Key, and a 3/8" x 3" Hex
bolt and Stover nut.
bolt and Stover nut.
11. INSTALLING THE SWEEP FLIGHTING
NOTE: Use the Table below to
determine the quantity and
lengths of the Sweep Flights
and Back Shields for the given
Bin Diameter.
determine the quantity and
lengths of the Sweep Flights
and Back Shields for the given
Bin Diameter.
B. Attach the UJoint Flight Shaft to the UJoint using
a 3/8" x 1½” Square Key, and a ½” x 3¼” Hex
bolt and Stover nut. Tighten both setscrews after
installation of keys.
bolt and Stover nut. Tighten both setscrews after
installation of keys.
Centerwell
Gearbox Shaft
1/4” x 11/4” Key
UJoint
3/8” Stover
Nut
UJoint
1/2” x 31/4”
Hex Bolt
UJoint
Flight Shaft
3/8” x 11/2” Key
1/2” Stover Nut
FIG. 11A
FIG. 11B
3/8” x 3” Hex Bolt
B in Dia.
Quantity
Length
1
6' 10"
1
8' 4"
1
8' 4"
1
9' 101/4"
1
5' 4"
1
6' 10"
1
8' 101/2"
1
5' 4"
2
9' 4"
1
8' 4"
2
9' 4"
1
6' 10"
2
8' 4"
1
9' 4"
3
8' 4"
1
9' 4"
2
8' 4"
1
9' 4"
1
9' 101/4"
Sw e e p Flights a nd Ba ck Shie lds
54
48
42
36
78
75
72
60