for technical questions, please call 1-800-444-3353.
View from above
to
corner 
Stud (1)
left 
doorway 
Stud (6)
front floor plate (17)
to
corner 
Stud (29)
Right 
doorway 
Stud (7)
Install the Left and Right Doorway Studs (6, 7) to the outside of the frame so that 
they rest flat against the frame.  Their orientation should be the same as shown 
above.  Slide a Bolt (43) into each slot for later Front Brace (23) assembly.  Slide a 
Hold-Down Connector (55) under the base and over the Bolt at each bottom con-
nection, do not secure with a Nut (52) until the next step.
Remove the bottom Bolt from the Corner Brackets (13) at the front of the greenhouse.  
Install the Front Diagonal Braces (25) with their flanges facing inward to the bottom 
hole of the Brackets on the inside using Bolts (43).  Attach the bottom of the Front 
Diagonal Braces (25) to the Bolt left exposed on the Floor Plate (17) from the last 
step.  
(See figure c.)
Remove next bolt up from the front Corner Brackets (13).  Connect the Front Braces 
(23) to the exposed hole.  Connect the loose ends of the Front Braces (23) to the 
Doorway Studs (6, 7), using the Bolts (43) included in the Doorway Studs (6, 7) in 
step 5, above.  
(See figure c.)
Attach the Door Slide Support (19) to the Front-Left Crown Beam (3) using the Long 
Door  Support  Bolt  (38)  and  Nut  (52),  with  the  Door  Support 
Spacer (39) between the Support and the Stud.  
(See figure c, 
inset, and diagram to the right.)
The frame should now rest square.  Measure diagonally from cor-
ner to corner at the top.  If the measurements are not equal, adjust 
the frame as needed until square.  Some Nuts (52) may need to 
be temporarily loosened to adjust the frame properly.
Place the Gutter End Caps (48) onto the ends of the Side Ceiling Plates (36) oriented 
with a gap in the bottom to allow water to drain out of the gutters.