Vogelzang International Mountaineer Woodstove VG650ELG Manual De Usuario

Descargar
Página de 18
VGZ-025 / 100105.0
VG650ELG MOUNTAINEER™ / 
Page 3
ASSEMBLY INSTRUCTIONS
NOTICE: Vogelzang International Corp. grants no warranty, stated or implied, for the installation or maintenance of
your wood stove and assumes no responsibility of any incidental or consequential damages.
TOOLS
TOOLS AND MATERIALS REQUIRED FOR INSTALLATION
•   Pencil
• 6 foot Folding Rule or Tape Measure
• Tin Snips
• Drill: Hand or Electric
• 1/8” dia. Drill Bit (for sheet metal screws)
• Screwdrivers (blade and Phillips type)
• 14mm Nut Driver or Ratchet with 14mm Socket
• Safety Glasses
• Gloves
MATERIALS
(NOTE: The following items are NOT included with your stove)
Flooring Protection: 41” x 48” as specified (see page 3)
Chimney Connection: 6” black steel (24 ga. min.) straight stove
pipe or elbow (as required)
1/2” Sheet Metal Screws
Chimney: Existing 6” Lined Masonry Chimney or 6” Inside Dia.
listed Type HT chimney.
Furnace Cement (manufacturer recommends Rutland Code 78
or equivalent)
CAUTION: STOVE IS HEAVY. MAKE SURE YOU
HAVE ADEQUATE HELP AND USE PROPER
LIFTING TECHNIQUES WHENEVER MOVING
STOVE.
1. Uncrate the stove and remove all cardboard and
styrofoam packing materials and protective
poly bag. Remove rear deflector (#2), pedestal
base (#18) and pedestal top (#14) from the car-
ton. (Save cardboard for further assembly.)
2. Remove parts from inside stove. Parts include:
damper (#5), damper collar (#4), blower as-
sembly (#3), ash drawer (#13), pedestal front
(#17), pedestal sides (#15), pedestal drawer
slide (#16), and hardware pack (#19) located
inside firebox.
3. Using the self-tapping screws provided in the
hardware pack, attach both pedestal sides (#15)
to the pedestal front (#17).
4. Place flattened carton on floor and place
pedestal base (#18) down with face side up.
5. Place pedestal side/front assembly on top of
base. Align holes in pedestal sides with holes
in base. Insert bolts into each hole.
6. Carefully tip the pedestal base backward and
thread a nut onto each bolt. Make sure to place
a lock washer on the bolt before the nuts.
Tighten all nuts and bolts.
7. Tip the pedestal base assembly upright.
8. Set the pedestal drawer slide (16) inside the
open box formed by the pedestal uprights and
fasten the slide to pedestal sides with two self-
tapping screws.
9. After properly locating flooring protector
(fig. 1, page 4) to accommodate minimum stove
clearances, place pedestal in position on
floor protector.
10. Place pedestal top (#14) onto pedestal base as-
sembly as shown in exploded view on page 13
and align mounting holes with those in the ped-
estal sides. Insert bolts thru the top and sides
and install a nut on the inside and hand tighten.
Once all bolts and nuts have been installed,
securely tighten all mounting hardware.
11. Insert the ash drawer (#13)
12. Carefully position stove body (#1) onto ped-
estal base assembly aligning studs in bottom
of stove with mounting holes in the corners of
the pedestal top (#14). NOTE: Stove body is
HEAVY. Make sure you have adequate help
to lift stove body onto pedestal and use
proper lifting techniques.
  Install nuts onto
mounting studs and tighten securely.
13. Attach rear deflector to the rear side corners of
the stove using four screws provided.
14. Attach blower assembly (#3) to back of rear
deflector. NOTE: Make sure ceramic gasket is
positioned between rear deflector and blower
assembly.
15. Install damper (#5) into damper collar (#4) [see
damper installation on page 6] and secure to
top surface of stove using machine screws.
NOTE: After installation damper must be able
to open fully and close to approximately 75 to
80 percent.