Circulators in following illustrations are mounted on system supply side, mounting on system return side is also 
acceptable practice.
1. 
Boiler used in connection with refrigeration system, 
install so chilled medium is piped in parallel with boiler 
with appropriate valves to prevent chilled medium from 
entering boiler. See Figure 2.
2. 
Boiler piping system of hot water boiler connected to 
heating coils located in air handling units where they 
may be exposed to refrigerated air circulation must be 
equipped with flow control valves or other automatic 
means to prevent gravity circulation of boiler water 
during cooling cycle.
3. 
Hot water boilers installed above radiation level or 
as required by authority having jurisdiction must be 
provided with low water cut-off device.
4. 
Boiler connected to heating system utilizing multiple 
zoned circulators, each circulator must be supplied with 
flow control valve to prevent gravity circulation.
5. 
Hot water boilers and system must be filled with water 
and maintained to minimum pressure of 12 psi.
6. 
For Low Water Cutoff, see Figure 1 for minimum height. 
Use Kit #240010831. Follow instruction enclosed with 
the kit. Other LWCO's for their manufacture specific 
instructions.
7. 
Bypass piping is optional which gives ability to 
adjust supply boiler water temperature to fit system 
or condition of installation. This method of piping, 
however, is not typically required for baseboard heating 
systems. Typical installations where bypass piping is 
used are as follows:
A.  This method is used to protect boilers from 
condensation forming due to low temperature 
return water. Generally noticed in large converted 
gravity systems or other large water volume 
systems. Figures 4 and 5.
B.  These methods are used to protect systems using 
radiant panels and material they are encased in 
from high temperature supply water from boiler 
and protect boiler from condensation. 
NOTE#1:  When  using  bypass  piping,  adjust 
valves V1 & V2 until desired system temperature 
is obtained. See Figure 5, page 9.
NOTE#2:  Bypass loop must be same size piping 
as supply and return piping.
4 - CONNECTING SUPPLY AND RETURN PIPING
Figure 3 - Circulators Mounted on Supply System, Boiler Used In Configuration with Chiller System.  