Siemens TV Converter Box G120 Manual De Usuario

Descargar
Página de 147
 
 
 
 
 
 
 
    
Automation and Drives - SCE 
 
 
 
 
T I A  Training Document
 
Page 147 of 147 
 Module  
 
     H01 
Issued: 02/2008 
  Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET 
Preface         Notes         Startup with PROFIBUS         Startup with PROFINET         Program Example 
 
6.7 
Load the blocks for controlling the bucket elevator to the CPU 315-2DP  
 
10.  In the folder ’Blocks’, highlight ’OB1’, ’FC10’, ’DB20’ and ’DB21’. Load them to the CPU315F-
2PN/DP.(
→ OB1 → FC10 → DB20 → DB21 → 
 
 
 
After the blocks have been transferred, the program can be started.