Sapphire Audio DV425TR Manual De Usuario

Descargar
Página de 60
DV425TR DIRECT VENT ROOM HEATER
02/01                                                                                     Page 37                                                                               250-5533
Step 1.
 
Follow installation Steps 1 and 2 under 
vertical termination section.
Step 2.
 
Using the plumb-bob, mark the centerline of 
the venting system on the ceiling, and drill a small 
hole through the ceiling and roof at this point. From 
the roof, locate the drill hole and mark the outline of 
the cathedral ceiling support box.
Step 3.
 
Remove shingles or other roof covering as 
necessary to cut the rectangular hole for the support 
box. Cut the hole 1/8” (3mm) larger than the support 
box outline.
Step 4.
 
Lower the support box through the hole in the 
roof until the bottom of the box protrudes at least 
2” (51mm) below the ceiling (Figure 17). Align the 
support box both vertically and horizontally with a 
level. Temporarily tack the support box in place 
through the inside walls and into the roof sheathing.
Step 5.
 
Using tin snips, cut the support box from the 
top corners down to the roofline, and fold the resulting 
flaps over the roof sheathing (Figure 18). Before 
nailing it to the roof, run a bead of non-hardening 
mastic around the top edges of the support box to 
make a seal between it and the roof.  Clean out any 
combustible material from inside the support box.
Step 6.
 
Complete the cathedral ceiling installation by 
following the same procedures outlined in steps 4 
through 8 for vertical terminations.
VERTICAL INSTALLATION, cont.
Figure 17
LEVEL
CATHEDRAL CEILING
SUPPORT BOX
2" MIN. BELOW
FINISHED CEILING
CUT HOLE 1/8" 
GREATER IN SIZE 
THAN PATTERN OF 
SUPPORT BOX AS 
IT IS PROJECTED 
ONTO ROOF LINE
Figure 18
CATHEDRAL CEILING INSTALLATION