Nortel Networks Video Gaming Accessories 553-3001-211 Manual De Usuario
Page 192 of 894
NT5D11 and NT5D14 Lineside T1 Interface cards
Environmental specifications
Table 74 lists the environmental specifications of the lineside T1 card.
Installation and configuration
Installation and configuration of the lineside T1 card consists of six basic
steps:
steps:
1
Configure the dip switches on the lineside T1 card for the environment.
2
Install the lineside T1 card into the selected card slots in the IPE shelf.
3
Cable from the I/O panel to the Customer Premise Equipment (CPE) or
CSU, MMI terminal or modem (optional), external alarm (optional), and
other lineside T1 cards for daisy chaining use of MMI terminal
(optional).
CSU, MMI terminal or modem (optional), external alarm (optional), and
other lineside T1 cards for daisy chaining use of MMI terminal
(optional).
4
Configure the MMI terminal.
5
Configure the lineside T1 card through the system software and verify
self-test results.
self-test results.
6
Verify initial T1 operation and configure MMI (optional).
Steps 1-5 are explained in this section. Step 6 is covered in “Man-Machine T1
maintenance interface software” on
maintenance interface software” on
Table 74
Lineside T1 card – environmental specifications
Lineside T1 card – environmental specifications
Parameter
Specifications
Operating temperature-normal
15° to +30° C (+59° to 86°F), ambient
Operating temperature-short term
10° to +45° C (+50° to 113°F), ambient
Operating humidity-normal
20% to 55% RH (non-condensing)
Operating humidity-short term
20% to 80% RH (non-condensing)
Storage temperature
–50° to +70° C (–58° to 158°F), ambient
Storage humidity
5% to 95% RH (non-condensing)