Motorola PTP 400 Series Manual De Usuario

Descargar
Página de 208
 
 
49
7 Installation
 
 
Motorola recommends that only qualified personnel undertake the installation of a PTP 400 
Series Bridge solution.  
7.1 Preparation
 
 
Before proceeding with the installation you should:  
•  Check the contents of all packages against the parts lists shown in the packing list.  
•  Ensure that you have the correct tools for the job. 
•  Ensure that you are qualified to undertake the work.  
•  Ensure that you have taken the correct safety precautions.  
•  Have completed the site planning as described in section 6 “Site Planning”.  
7.2 Installation 
Procedure
 
 
The installation procedure for a PTP 400 Series system consists of the following steps:  
•  Mounting the ODUs, section 7.6 
•  Connecting up, section 7.7 
•  Mounting the PIDU Plus units, section 7.7.6 
• Powering 
Up, 
sectio
•  Aligning the ODUs, section 7.7.10  
7.3 Tools 
Required
 
 
The following specific tools are required to install the PTP 400 Series Bridge in addition to 
general tools:  
•  13mm Spanner / Wrenche 
•  RJ45 Crimp Tool  
•  IBM Compatible Personal Computer (PC) running Windows 98 or later with 10 or 
100baseT Ethernet (Ability to change IP settings easily is recommended)  
•  Either Internet Explorer version 6 or higher, or Mozilla Firefox v1.5 or higher are 
recommended. 
•  Ethernet patch cable  
•  6mm general purpose crimp tool for the grounding lug (
optional for lightening Protection
)