Country Flame Bayvue DV 30 Manual De Usuario

Descargar
Página de 48
 
VERTICAL AND HORIZONTAL VENT 
STEP 1.  Determine the amount of horizontal run for a specific installation.  Note the minimum vertical 
run and ensure it is met for a specific application as shown in FIGURE 17 below. 
STEP 2.  FIGURE 18 or 19 provides the minimum vertical rise required for a specific horizontal run 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FIGURE 17:  HORIZONTAL & VERTICAL VENT SYSTEM 
 
Version 1.0h 
27 
HORIZONTAL TOP FLUE INSTALLATION
Round Support  
Box/Wall 
Thimble
Standard 
Horizontal  
Terminal 
90 Deg. 
Elbow
Min. 24" Pipe 
Length  (if  
installation  
requires less 
vertical it must  
be installed as  
per horizontal 
rear flue  
instructions
Vertical  
Termination 
Cap
Storm Collar
Flashing
Ceiling  
Firestop
Pipe  
Lengths
Cathedral 
Ceiling 
Support 
Box
VERTICAL TERMINATION