Brocade Communications Systems Brocade MLX Series and Brocade Netlron XMR 53-1002373-02 Manual De Usuario

Descargar
Página de 452
Brocade MLX Series and Brocade NetIron XMR Hardware Installation Guide
273
53-1002373-02
Installing a Brocade NetIron XMR 32000 router
4
Installing a Brocade NetIron XMR 32000 router
This section describes how to install a Brocade NetIron XMR 32000 router:
Preparing the installation site
Before installing the router, plan the location and orientation relative to other devices and 
equipment. For cooling purposes, allow a minimum of six inches of space between the sides, front, 
and the back of the router and walls or other obstructions. If a router is installed within a perforated 
enclosure, the perforations must cover at least 60 percent of the surface.
Since you will be using a mechanical lift to move and install the router, make sure you allow enough 
working room.
NOTE
Make sure your site provides 200-240 AC power.
Ensure that the proper network and power cabling is installed in the site. For information on 
cabling, refer to 
Unpacking a Brocade NetIron XMR 32000 router
The Brocade NetIron XMR 32000 router ships with the following items:
Router chassis with the card slots empty, and covered with upper and lower shipping panels
The appropriate number of interface modules, switch fabric modules, management modules, 
and power supplies
A total of 32 slot blanks
Insertion or extraction tool for use with RJ 45 and fiber-optic connectors
If any items are missing, contact the place of purchase
Removing the Brocade NetIron XMR 32000 from the shipping crate
The Brocade NetIron XMR 32000 router ships in a wooden crate, bolted to an inner pallet, and 
resting on an outer pallet. To remove the router, the crate must be in the upright (vertical) position.
Before unpacking the router, the site should be prepared as described in 
 on page 273. You will need these tools:
A forklift or pallet jack with a minimum weight limit of 550 lb to move the router while still on 
the pallet.
A mechanical lift with a minimum weight limit of 350-lb limit to move the router off the pallet. 
The ideal configuration is a counterweight base material lift with a metal lift plate installed in 
place of the forks. The metal plate should be no wider than 17 inches, so that it will fit between 
the rack mount rails.
A strap to stabilize the router while it is being moved on the mechanical lift
A power drill
A large Phillips screwdriver attachment