Setting the switch IP address 
4
1.  Enter the required information on the Set Switch IP Address screen.
2.  If prompted to install Active X or a version of the Java runtime environment, do so. Reboot the setup computer, if required.
3.  Click Next.
 
The Confirm IP Address screen is displayed.
4.  Click Next to confirm the addresses.
 
A Continue Configuration screen is displayed.
5.  Click Continue with EZManager.
1.  Install the SFP transceivers in the ports on the switch to match the ports shown on the screen.
2.  Make the physical connections to your host and storage devices. Match the physical connections shown
 
on the Configure Ports and Connect Devices screen.
3.  Finish screen: Congratulations - you’ve successfully completed the setup! If you used the serial connection for setup,
 
you can remove the serial cable.
 
Additional configuration options, such as custom zoning, are available from EZManager. See the EZSwitchSetup
 
Administrator’s Guide for more information on custom zoning, and other switch configuration and management options.
Set the switch password
5
1.  Click Next on the EZManager Welcome to Switch Configuration screen.
 
The Set Parameters screen is displayed.
2.  Create a new administrator account password in the Set Parameters screen.
3.  Enter a new name for the switch (optional step).
4.  Adjust the date and time for your time zone (optional step).
5.  Click Next.
Configure the zones and perform device selection
6
1.  Select Typical Zoning on the Select Zoning screen and click Next.
 
Typical Zoning is the default zone configuration.
2.  Enter the number and types of devices that you are connecting to the switch on the Device Selection screen.
 
EZSwitchSetup uses these values to automatically configure the ports on your switch.
Connect devices
7
The Configure Ports and Connect Devices screen displays a graphical representation of the switch with the device connections
based on the information that you entered when you configured zones and performed device selection. The screen shows the
connections as missing until you connect the devices that you specified. 
a.  Remove any protector plugs from the SFP transceivers you are 
 
going to use.
b.  Position and insert each SFP transceiver until it is firmly seated.
c.  Close the latching bale.
a.  Remove plastic protector caps from the cable ends (if there are any),
 
and position the cable connector so that it is oriented correctly.
b.  Insert the cable connector into the SFP until it is firmly seated and
 
the latching mechanism clicks.
c.  The Configure Ports and Connect Devices screen shows missing,
 
valid, and invalid connections as you cable the switch. Note that it
 
can take up to 15 seconds for the connection to display as a valid
 
connection. Verify that the connections are all green and click Next.
®
!
!
1a
Brocade, the B-wing symbol, BigIron, DCX, Fabric OS, FastIron, IronPoint, IronShield, IronView, IronWare, JetCore, NetIron, SecureIron, ServerIron, StorageX, and
TurboIron are registered trademarks, and DCFM, Extraordinary Networks, and SAN Health are trademarks of Brocade Communications Systems, Inc., in the United
States and/or in other countries. All other brands, products, or service names are or may be trademarks or service marks of, and are used to identify, products or
services of their respective owners.
© 2009 Brocade Communications Systems, Inc. All Rights Reserved.
53-1001351-01
*53-1001351-01*