Breckwell SP 6000 Manual De Usuario

Descargar
Página de 29
INSTALLATION 
INSTALLATION 
Specifications 
Width: 27 ¼” 
Height: 35 ½” 
Depth:
 
28 ⅝”  
Weight:
 
225 Pounds 
Flue Size: 3” or 4 “ 
Hopper Capacity:
 
90 Pounds (Corn) 
(This will vary depending on fuel) 
EPA Status: Exempt 
Maximum BTU Input:
 
50,000 BTU with whole 
corn 
 
 
Approved Installations 
Alcove, Conventional, Mobile Home 
 
 
Preparation 
Factory packaging must be removed, and some 
minor assembly work is required prior to 
installation and use.  Access to the rear and 
sides of the stove will be necessary at some 
point in time so be sure to leave ample room for 
access, otherwise, be prepared to move the 
stove when necessary. 
 
Install the ceramic Brick Panel onto the rear 
combustion wall.  T
HIS IS A REQUIRED 
COMPONENT
.  The Brick Panel is fragile, so 
handle with care at all times.  Your stove warranty only covers this item from thermal breakage.  Impact damage 
resulting from dropping or accidental abuse is not covered. 
 
AUGER INSTALLATION:  Install the auger into the auger tube as shown in 
Figure 2.  The flat face of the auger is toward the front of the stove, and the 
beveled edge will go into the auger tube.  Make sure the auger is all the way 
to the rear and is engaged or seated properly. 
 
 
 
 
STIR
 
ROD
 
&
 
BURN
 
POT
 
INSTALLATION:  The Burn Pot must 
be set into the Burn Pot Holder with the fuel spreader towards 
the rear of the stove, as shown. 
 
Insert the stir rod into the burn pot with the beveled connector 
toward the left.  Align the beveled segments so that the holes on 
each piece align, and insert the cotter pin. 
 
Pressing the Auger Feed button while the stove is off rotates the 
stir motor shaft.  This will assist you in aligning these two pieces.