GeniSys Control 24V Control Installation and Operation Manual
If the burner or control fails any of the 
following tests, recheck control wiring.  If the 
burner or control still fails any tests, replace 
the control.
Starting the System
Open the shut-off valve(s), if 
applicable, in the supply line from 
the oil tank.
Close the disconnect switch to 
supply power to the burner.
Adjust the thermostat to call for heat.
If the pump has not been primed, 
refer to “Priming the Pump” in this 
manual.
Monitor burner operation to insure 
that the burner ignites.
1.
2.
3.
4.
Wiring:
Incorrect Wiring Will 
Result in Improper 
Control Operation
GeniSys 24V wiring label colors may 
not match the wire colors of the burner 
or other manufacturers’ controls.
The GeniSys 24V Control should be 
wired according to the equipment 
manufacturer’s instructions.
y
y
CAUTION
Startup / Checkout
End the call for heat.  Verify that the 
burner turns off before leaving the 
installation site.
Check Safety Features
Safe Start Check
Place a jumper across the cad 
cell terminals.
Refer to the steps for 
Starting the System” and 
have the system call for heat.
Burner must not start.  Verify that 
the control remains in Standby 
mode.
End the call for heat and remove 
the cad cell jumper.
Simulate Flame Failure and Ignition 
Failure
Refer to the steps for “Starting the 
System” and have the system call 
for heat.
After fl ame is established and the 
burner igniter turns off (if wired for 
interrupted ignition), simulate fl ame 
failure by pulling the cord set out of 
the solenoid valve. 
At fl ame loss, the control will enter 
Relight mode. The control will 
immediately turn the igniter on.
After the 15 second lockout time, 
the control will lock out the burner.  
Verify that the burner motor and 
igniter are off and that the burner 
oil solenoid valve (if used) is not 
energized.
Push the cord set back in.
To reset the control from lockout, 
turn off power to the control for at 
least 2 seconds.
Turn power on and verify that the 
burner lights.
End the call for heat.
Insure that all control wiring is correct 
prior to securing the control.  Consult 
equipment manual for details.
5.
1.
2.
3.
4.
1.
2.
3.
4.
5.
6.
7.
8.
Make sure all equipment wiring 
complies with all local codes and 
ordinances.
Make connections to the control’s 
terminals as shown in Figure 2.  Refer 
to the label on the underside of the 
control for wiring details.
Motor-off delay on a 7559P will be 
disabled if the safety and operating 
limits as shown in Figure 2 interrupt 
power to the control’s red +24 volt wire.
Input power to the control’s red +24 
volt wire must be provided from a fused 
service switch, rated at 50 amps or less.