IV.  OPERATION
A.
  PRIOR TO OPERATION
1.   Check all electrical connections to assure they are 
secure.
2.   Check rigidity of unit mounting. Tighten all 
fasteners, if necessary.
3.   Inspect piping, strainers, traps, fi ttings, etc.
B.
 INITIAL START-UP
1.   Set thermostat to lowest position.
2.   Turn on power supply to unit. 
3.   Open return gate valve, and then open supply gate 
valve to unit.
4.   Raise thermostat setting to desired position.
5.   Adjust louvers (if provided) for desired heat 
distribution.
6.   To insure proper sequence of operation, cycle unit 
on and off a few times by raising and lowering 
thermostat setting.
7.   Check for proper rotation of fan. All fans must rotate 
in a counterclockwise direction when viewed from 
the back (BH) of the unit heater.