Completely read, understand and follow all 
instructions in this manual before attempting 
start-up.
A.
  Safe operation and other performance criteria were met 
with the gas manifold and control assembly provided 
on boiler when boiler underwent tests specified in 
American National Standard for Gas-Fired Low-
Pressure Steam and Hot Water Boilers, ANSI Z21.13.
B.
  Check Main Burners. Main burners must be properly 
located on support bracket in Base Rear Panel, seated 
on Main Burner Orifices, and secured with hitch pin 
clips.
C.
  Verify that the venting, water piping, gas piping 
and electrical system are installed properly.  Refer to 
installation instructions contained in this manual.
D.
  Confirm all electrical, water and gas supplies 
are turned off at the source and that vent is clear of 
obstructions.
E.
  FILL ENTIRE HEATING SYSTEM WITH WATER 
and vent air from system. Use following procedure on 
a Series Loop or multi-zoned system installed as per 
Figure 21 to remove air from system when filling.
The maximum operating pressure of this boiler is 
50 psig.  Never exceed this pressure.  Do not plug 
or modify pressure relief valve.
1.  Close full port ball valve in boiler supply piping.
2.  Isolate all zones by closing zone valves or shut-off 
valves in supply and return of each zone(s).
3.  Attach a hose to the vertical purge valve located 
prior to the full port ball valve in the system supply 
piping.  (Note - Terminate hose in five gallon bucket 
at a suitable floor drain or outdoor area).
4.  Starting with one circuit at a time, open zone valve 
or shut-off valve in system supply and return piping.
5.  Open purge valve.
6.  Open fill valve (Make-up water line should be 
located directly after full port ball valve in system 
supply piping between air scoop and expansion 
tank).
7.  Allow water to overflow from bucket until discharge 
from hose is bubble free for 30 seconds.
8.  Close the open zone valve or shut-off valve for the 
zone being purged of air, then open the zone valve 
or shut-off valve for the next zone to be purged.  
Repeat this step until all zones have been purged.  At 
completion, open all zone valves or shut-off valves.
VIII. System Start-Up
9.  Close purge valve, continue filling the system 
until the pressure gauge reads the desired cold fill 
pressure.  Close fill valve.  
   (Note - If make-up water line is equipped with 
pressure reducing valve, adjust pressure reducing 
valve to desired cold fill pressure.  Follow fill valve 
manufacturer’s instructions).
10.  Open isolation valve in boiler supply piping.
11.  Remove hose from purge valve.
F.
  Confirm that the boiler and system have no water 
leaks.
G.
  Prepare to check operation.
1.  Obtain gas heating value (in Btu per cubic foot) 
from gas supplier.
2.  Connect manometer to pressure tap on gas valve.  
Use 1/8 NPT tapping provided.
3.  Temporarily turn off all other gas-fired appliances.
4.  Turn on gas supply to the boiler gas piping.
5.  Confirm that the supply pressure to the gas valve is 
14 in. w.c. or less.  
6.  Open the field installed manual gas shut-off valve 
located upstream of the gas valve on the boiler.
7.  Using soap solution, or similar non-combustible 
solution, electronic leak detector or other approved 
method.  Check that boiler gas piping, valves, and 
all other components are leak free.  Eliminate any 
leaks.
8.  Purge gas line of air.
H.
  Follow Lighting or Operating Instructions to place 
boiler in operation. Refer to label on inside of Front 
Removable Panel or appropriate Figure as listed in  
Table 11.
Do  not  use  matches,  candles,  open  flames  or 
other ignition source to check for leaks.
Ignition System
Lighting or 
Operating 
Instructions
Pilot Flame 
Illustration
Standing Pilot (24)
Figure 40
Figure 44
Honeywell EI
Figure 41
Figure 45
EP
Figure 42
Figure 46
EP-CSD-1
Figure 43
Figure 46
Table 11:  Lighting and Operating Instructions