Bradley Smoker HN200 Manual De Usuario
ADA Compliant Recess-Mounted Shower
HN200
HN200
Installation Instructions
Bradley Corporation • 215-1189 Rev. F; EN 02-342
4
Installation Instructions
NOTE: Flush the supply lines before making connections.
NOTE: Install the supply inlets no lower than 48" and no higher than 60" off of finished floor.
Step 1: Rough in piping for shower
NOTE: When facing the wall, the supply pipe to the left of the centerline is HOT.
1. Rough in 1/2" NPT hot and cold water supply piping for valve at the dimension shown in Figure
1 (piping supplied by installer).
2"
(51mm)
1/2" NPT
SUPPLIES
40"
(1015mm)
2-1/2"
(64mm)
TYP.
45"
(1143mm)
7-1/2"
(191mm)
NOTE: WALL OPENING RECESS
TO BE 4" (102mm) DEEP
C
L
3-3/4"
(95mm)
2"
(51mm)
NOTE: Due to differing state codes, if the
valve height is different from the indicated
43" (1091 mm), all dimensions within the
symbol must be changed by the same amount.
valve height is different from the indicated
43" (1091 mm), all dimensions within the
symbol must be changed by the same amount.
Example: If the code approved height is 40",
then 43" (1091mm) - 40" (1015mm) = 3"
(76mm). Result: Subtract 3" (76mm) from all
dimensions within the symbol.
then 43" (1091mm) - 40" (1015mm) = 3"
(76mm). Result: Subtract 3" (76mm) from all
dimensions within the symbol.
15"
(381mm)
48"
(1219mm)
A.F.F.
18"
(457mm)
WALL
OPENING
OUTLINE
Figure 1
20"
(508mm)
38-1/8"
(968mm)
A.F.F.
72"
(1829mm)
A.F.F.
48"
(1219mm)
to 60"
(1524mm)
A.F.F.
BACK
WALL
FRONT OF
SHOWER