White Rodgers 50A56-956 Replacement Kit for York Single Stage Integrated Furnace Control Selectable Continuous Fan Speed Instruccion De Instalación

Descargar
Página de 12
2
SPECIFICATIONS 
ELECTRICAL RATINGS [@ 77°F (25°C)]:
Input Voltage: 25 VAC 50/60 Hz
Max. Input Current @ 25 VAC: 0.45 amp
Relay Load Ratings:
Valve Relay:  1.5 amp @ 25 VAC 50/60 Hz 0.6 pf
Ignitor Relay:  6.0 amp @ 120 VAC 50/60 Hz (resistive)
Inducer Relay:  2.2 FLA–3.5 LRA @ 120 VAC
Circulator Relay:  14.5 FLA–25.0 LRA @ 120 VAC
Flame Current Requirements:
Minimum current to insure flame detection: 1 µa DC*
Maximum current for non-detection: 0.1 µa DC*
Maximum allowable leakage resistance: 100 M ohms
*Measured with a DC microammeter in the flame probe lead
TIMING SPECIFICATIONS
(All times are in seconds, unless noted otherwise)
Event
Definition
50A56-956
Pre-Purge
The period of time intended to allow for the dissipation of any unburned 
gas or residual products of combustion at the beginning of a furnace 
operating cycle prior to initiating ignition
0
Trial for Ignition 
Period (TFI)
The period of time between initiation of gas flow and the action to 
shut off the gas flow in the event of failure to establish proof of the 
supervised ignition source or the supervised main burner flame.
7
Ignition Activation 
Period (IAP)
The period of time between energizing the main gas valve and 
deactivation of the ignition means prior to the end of TFI
5
Retries
The additional attempts within the same thermostat cycle for ignition 
when the supervised main burner flame is not proven within the first 
trial for ignition period.
2 times
Recycles
The additional attempts within the same thermostat cycle for ignition 
after loss of the supervised ignition source or the supervised main 
burner flame.
4
Valve Sequence 
Period
Valve sequence period equals 7 seconds trial for ignition period x 
(1 initial try + 2 retries) + 12 seconds.
21
Interpurge
The period of time intended to allow for the dissipation of any unburned 
gas or residual products of combustion between the failed trial for 
ignition and the retry period.
15
Post-Purge
The period of time intended to allow for the dissipation of any unburned 
gas or residual products of combustion at the end of a furnace burner 
operating cycle. Post-purge begins at the loss of flame sense.
15
Lockout Time
ANSI standard rated module timing.
140
Heat Delay-To-Fan-On
The period of time between proof of the supervised main burner flame 
and the activation of the blower motor at Heat speed.
30
Heat Delay-To-Fan-Off*
The period of time between the loss of a call for heat and the 
deactivation of the blower motor at Heat speed.
60/90/120*/180
Cool Delay-To-Fan-On
The period of time after a thermostat demand for cool before energizing 
the circulator blower motor at Cool speed.
0
Cool Delay-To-Fan-Off*
The period of time between the loss of a call for cool and the 
deactivation of the blower motor at Cool speed.
60
Initial Ignitor Warm-up
The length of time allowed for the igniter to heat up prior to the initiation 
of gas flow.
17
Ignitor Warm-up Retries
In the event of a retry, the warm-up time will be increased by one 
second, up to a maximum of 27 seconds, and locked at that duration
27
Auto Reset
After one (1) hour of internal or external lockout, the control will 
automatically reset itself and go into an auto restart purge for 60 seconds.
60 minutes
Electronic Air Cleaner
Yes
Humidifier
Yes
*This time will vary depending on option switch position. The control is factory set at 120 seconds HEAT delay-to-fan-off. 
See OPERATION section for further information
OPERATING TEMPERATURE RANGE:
-40° to 176°F (-40° to 80°C)
HUMIDITY RANGE:
5% to 93% relative humidity (non-condensing) 
MOUNTING:
Surface mount multipoise
Timing Specs: (@ 60 Hz**)
 
maximum
Flame Establishing Time: 
0.8 sec
Flame Failure Response Time: 
 2.0 sec
Gases Approved: Natural, Manufactured, Mixed, Liquified 
Petroleum, and LP Gas Air Mixtures are all approved for use.
**At 50% Hz, all timing specifications should be increased by 20%