Furuno FELCOM 16 Manual De Usuario

Descargar
Página de 187
7. MAINTENANCE, TROUBLESHOOTING 
 
7-6 
7.3.3 
Results of PV test 
1.  At the standby display, press the [F7] key to display the Options menu.   
2.  Press the [7] key to display the Test menu. 
3.  Press the [2] key to display the results of the PV test. 
1. Login
2. Logout
3. Abort
4. Select NCS
5. Ocean Region
6. Test
Options
1. PV Test
2. PV Test Result
3. Self Test
4. Distress Alarm Button Test
Test
Test Date & Time
Attempts
BBER
Shore-to-Ship Attempts
Ship-to Shore Attempts
Distress Alert
Signal strength
Overall Result
02-02-25  01:58 (UTC)
First attempt
Pass
First attempt
First attempt
Pass (Test OK)
Pass (Greater than Std level + 10dB)
Pass (Applicable tests pass)
Ctrl+P: Print   ESC: Quit
PV Test Result
 
Sample PV test results 
4.  To return to the standby display, press any key.   
 
Interpreting the PV test results display 
Test Date & Time: 
Date and time of test 
Attempts: 
Number of times the PV test was conducted. 
BBER: 
Bulletin Board Error Rate (%). “Pass” appears for no 
error. 
Shore-to-Ship Attempts:  Number of tests initiated by LES. 
Ship-to-Shore Attempts:  Number of tests initiated by MES. 
Distress Alert: 
“Pass (Test OK)” appears for successful testing. 
Signal Strength: 
“Pass” appears if signal strength is greater than 
standard level. 
Overall Result: 
“Pass” appears for satisfactory completion of the 
test.