Turbomachinery Package Specification 
Titan 
250 Generator Set 
16.2.6 Source 
Inspection 
As an option, Solar can conduct a final product inspection at the supplier facility for the 
following contract-specific items: 
•  Inlet system filter 
•  Inlet system silencer 
•  Exhaust system silencer 
•  Lube oil cooler 
•  Generator, including rotor balancing and standard generator testing 
16.2.7 Customer 
Participation 
As an option, the customer may witness specified tests on a noninterference basis and/or 
hold point basis. 
16.2.8 Weld 
Radiography 
As an option, radiographic welding inspections can be performed on a percentage of the 
gas fuel and/or lube oil system piping and manifolds. 
© 2008 Solar Turbines Incorporated. All rights reserved. 
TPS250GS/908 - Preliminary 
65