Turbomachinery Package Specification 
Titan 
250 Generator Set 
•  Graphics in a separate window for simultaneous viewing of text with associated 
illustration 
•  PDF version for printing 
17.5.5  Service Parts List 
Identifies operational service parts and tooling. Once engineering has been finalized and 
manufacturing bills are available, Solar's Service Parts department creates a detailed 
listing of service parts from the actual equipment manufacturing bills of material. 
 
Table 14.  Preservation, Installation, and Documentation Specifications 
Mechanical Installation Requirements 
Mounting  
Space Between Units In Multiple-Unit 
Installations 
A Minimum of 2.5 m (8 ft) 
Lube Oil Cooler(s) 
 
Top of The Lube Oil Cooler(s) 
Not Be More Than 9 m (30 ft) Above The Bottom of 
The Package Frame, See Note (a) 
Total oil volume of “Outgoing and Return” 
Lines 
1282 L (340 gal) 
Total Combined Pressure Drop of The 
Supply and Return Lines and Lube Oil 
Cooler(s) 
Should Not Exceed 345 kPag (50 psig) 
Start, Fuel, Lube, Air/Drain System Schematics
 
Compliance 
American National Standards Institute (ANSI) Y32.10 
Solar’s Applicable Engineering Specifications 
ES 9-4 
Interpretation of Drawing Requirements 
ES 9-76 
Traceability Requirements Critical Parts, Engine and Related Systems 
ES 2231 
Standards and Practices for The Design and Installation of Cable Channels and TC 
Rated Cables Installed In Class 1, Division 2 Hazardous Areas 
Solar’s Applicable Product Information Letters 
PIL 184 
Documentation for New Equipment 
PIL 097 
Package Preservation and Preparation for Shipment 
Notes
(a) 
This is to prevent oil tank flooding in the event of a drain back. 
 
© 2008 Solar Turbines Incorporated. All rights reserved. 
TPS250GS/908 - Preliminary 