Bryan Boilers CLM-150-S150-GI Manual De Usuario

Descargar
Página de 4
Low initial cost, high operating effi ciency
deliver substantial return on investment
Water Boiler
Combination thermometer and pres-
sure gauge, ASME-rated boiler relief 
valve, water temperature control 
(240°F max. std.), high limit control, 
probe LWCO.
Steam Boiler
Steam pressure gauge, steam pres-
sure control, combination low water 
cutoff and pump control, auxiliary low 
water cutoff with manual reset, high 
limit pressure control, ASME-rated 
boiler relief valve, water glass set.
Atmospheric equipment
Electronic combustion safety control, 
automatic operating gas valve, safety 
gas valve, pilot solenoid valve, electric 
When ordering, please 
specify:
1. Boiler size
2.  Supply and return 
 temperatures 
required
3.  Boiler relief valve setting
4.  Type of fuel: natural 
or LP,  BTU content, 
specifi c gravity and 
pressure available
5.  Optional extra equip-
ment or construction
6.  Special approvals re-
quired (UL, CUL, 
CSD-1, FM or IRI)
7. Altitude
Bryan CLM Series Boilers Standard and Optional Equipment
STANDARD EQUIPMENT 
FURNISHED
Quality Construction Features
A.  Heavy steel boiler frame, built and stamped 
in accordance with the appropriate ASME 
boiler code. 
B.  Large volume water leg downcomers pro-
mote rapid internal circulation, temperature 
equalization and effi cient heat transfer.
C.    Bryan bent water tubes are fl exible, individu-
ally replaceable without welding or rolling. 
Never more than two tube confi gurations.
D.  Boiler tube and furnace area access panel: 
heavy gauge steel casing with 2" high tem-
perature ceramic fi ber and insulation, bolted 
and tightly sealed to boiler frame.
OPTIONAL 
CONSTRUCTION:
Steam boiler
Optional construction to ASME Power 
Boiler Code requirements for pressure 
exceeding 150 psi to maximum of 300 
psi design pressure.
Hot water boiler
Optional construction to ASME 
Power Boiler Code requirements for 
temperatures exceeding 240°F and/or 
pressure exceeding 160 psi to maxi-
mum of 285°F operating and 300°F 
design temperature and 250 psi.
OPTIONAL EQUIPMENT:
1.  Manual reset high limit control
2.  Manual reset low water cutoff
3.   Auxiliary low water cutoff (water)
4.  Combination low water cutoff 
and feeder
5.   Alarm bells or horns
6.  UL, CUL, CSD-1, FM, IRI or 
other insurance approved 
 control 
systems
7. Low 
fi re start, Hi-Lo or 
 modulation 
fi re control
8.  Indicating lights, as desired
G
F
E
D
H
A
C
B
9.  Lead-lag systems for two or 
more boilers with or without 
outdoor reset control
10. Heat exchanger coils for 
 domestic 
water
11. Special construction: left hand, 
Knocked Down
ignition assembly, main manual gas 
shut-off valve, pilot shut-off valve, 
pilot and main gas pressure regula-
tors, barometric draft controller, all 
controls installed and wired standard 
voltage 120/1/60.
 True “fl exible water tube” design guaranteed 
shock free
 Longer service life with superior performance
 Full fi ve sq ft of heating 
  surface per BHP
J.  Control panel: all controls installed and connected 
to terminal strip.
K.  Water side or steam side interior accessible for clean-
out and inspection, front and rear openings, upper 
and lower drums.
L.   Steam boilers with extra large drum with high steam 
release area ensure stable water level and dry steam.
J
I
K
L
E.  Jacket access panels make the interior of the boiler 
easily accessible for service and inspection.
F.   Heavy gauge steel boiler jacket with rust-resistant 
zinc coating and attractive enamel fi nish, insulated 
with 1½" fi berglass to insure exceptionally cool outer 
surface.
G.  Minimum sized fl ue vent.
I.    All controls, gauges, relief valve(s) are factory installed 
and wired and easily accessible for servicing.