Zephyr COKE36BBMX Manual

Descargar
Página de 10
8
www.zephyronline.com
1. Determine blower position (examples on page 5). 
 
Install each of the (2) mounting brackets to the sides of 
the in-line blower housing using (4) M4x8 screws per 
bracket. There are possible (4) mounting positions for 
the brackets.  
FIG. A   Note:  Brackets must be secured 
to studs using (2) M4 x 1-1/2” screws per bracket. 
2.  Run 10” round ducting to inlet and outlet of in-line blower 
housing.  Secure with aluminum duct tape.  
Note:  Cheng 
and Arc Collection hoods require a 10” to 8” round 
transition to be installed prior to the duct passing through 
the ceiling.  8” round ducting is then connected to the hood. 
A 10” to 8” transition is included with the blower. 
FIG. B
3. Run electrical conduit per local codes from junction 
box on top of in-line blower to blower wiring 
harness on top of the range hood. See instructions 
included with range hood for more information. 
 
4.  Run (5) wires through conduit (black, white, blue, red 
and green ground).  
Check local code compliance 
for style and gauge of wires. The ground wire shall 
have a suitable gauge according to the Electrical Code 
and Regulations.  Connect wires to in-line blower and 
blower wiring harness on hood per the diagram in  
FIG. 
C.   A cable lock (not supplied) might be required by local 
codes.  Check with local code requirements, purchase 
and install appropriate connector if necessary.  
FIG. D
5.  Turn circuit breaker on, power on hood and test all 
functions. Check for leaks around duct connections.
    
1
2
3
4
bracket positions
outlet
CAUTION: At least two installers are required
        due to the weight and size of the blower.
!
WARNING:  Electrical  wiring must  be  done  by  a  qualified person(s)  in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
Installation – 
Mounting the Blower
White (common)
Black (high)
Blue (med)
Red (low)
Green (ground)
PBN-1000A
HOOD
wiring harness
FIG. A
outlet
10” round 
ducting
10” round 
ducting
10” to 8”
transition
(if needed)
ceiling
wood 
stud
PBN-1000A
in-line blower
bracket
electrical
conduit
8” round 
ducting
FIG. B
Cable 
Lock 
FIG. C
FIG. D