Dacor ER36DCLPH Guía De Diseño
PLANNING
GUIDE
Web: http://www.Dacor.com
Corporate Phone: 800-793-0093
Specifications are subject to change without notice.
See installation instructions for additional details.
8.3
36”, 48” Wide,
Downdraft Raised Vent
Revised
02/03/09
ERV36-ER, ERV48-ER
2/2
Rear Exhaust Knock Out (3 1/4” X 10”)
3”
Vertical center line of rear exhaust knock out lines up with vertical
center line of chassis
On 46” and 48” wide models, the vertical center line of bottom knock-
out lines up with vertical center line of chassis
On 30” and 36” wide models, the vertical center line of bottom knock-
out is offset 3”
Side Exhaust Knock Outs (1 5/8” X 16”)
Bottom Exhaust Knock Out (1 5/8” X 16”)
Motor
Cover
26" (660 mm)
6 1/4"
(159 mm)
1 1/8"
(29 mm)
CL
CL
CL
NOTES:
1. IMPORTANT: USE ONLY APPROVED BLOWERS
WITH THIS RAISED VENT. APPROVED BLOWERS:
DACOR MODEL REMP3 OR REMP 16.
ATD2
5”
X
ADT2 Transition
All duct work materials (including screws and duct tape) must
◊
be purchased separately by the customer.
When planning new duct work, always look for the shortest,
When planning new duct work, always look for the shortest,
◊
most direct route to the outside. See page 5 for examples.
You can increase the duct size over the duct run if desired. To
You can increase the duct size over the duct run if desired. To
◊
prevent a back draft, never decrease the duct size over the
run.
Do not rely on duct tape alone to seal duct joints. Fasten all
Do not rely on duct tape alone to seal duct joints. Fasten all
◊
connections with sheet metal screws and tape all joints with
certified silver tape or duct tape.
Use sheet metal screws as require to support the duct weight.
Use sheet metal screws as require to support the duct weight.
◊
To prevent back-drafts, a damper at the duct outlet may also
◊
be required.
On side exhaust installations, allow five inches of space on the
On side exhaust installations, allow five inches of space on the
◊
side for the ADT2 exhaust transition plus additional space for
the duct attached to it (X).
Make sure duct work does not interfere with floor joists or wall
Make sure duct work does not interfere with floor joists or wall
◊
studs.
With concrete slab construction,
With concrete slab construction,
◊
“box-in” the duct work to prevent
it from collapsing when the wet
concrete is poured. Also allow room
for electrical wiring/conduit from the
remote blower.
Cross-drafts or air currents from
Cross-drafts or air currents from
◊
adjacent open windows or doors,
heating/air conditioning outlets,
ceiling fans and recessed ceiling
lights reduce vent efficiency.
3 1/4” X 10” to duct work
2” X 16”, connects to side or
bottom exhaust on raised vent
1"
(25 mm)
5"
(127 mm)
AtD2 EXhAUst tRANsIstION