Zephyr ZSAM90CW Uso Y Cuidado

Descargar
Página de 44
9
1.  Measure from range top to hood bottom and mark line A.  
´PLQLPXPIURPUDQJHWRS 
2.  Plum and mark center line.
 0DUNKRRGKHLJKWOLQH% ´IURPOLQH$
 0DUNPRXQWLQJVSUHDGIURP&/ ´RQOLQH% 
 )DVWHQ  0[´VFUHZVLQWRVWXGVRQOLQH%EXW
do not tighten all the way.  Note: Wood blocking may 
need to be added behind the drywall if no studs are 
present.  Wall anchors may also be used but check 
local codes for compliance. Failure to use suitable 
wall anchors and screws to hold the weight of the 
hood could result in personal injury or damage to 
the cooking surface or counter.
 5HPRYHWKH  DOXPLQXPPHVK¿OWHUV
7.  Hang hood onto the mounting screws and hand tighten 
HDFKVFUHZ )LJ$ 
8.  Center and attach duct cover mounting bracket to wall 
MXVWEHORZWKHFHLOLQJRUVRI¿WXVLQJ  0[´VFUHZV
9.   Install electrical and duct work.  Seal duct work with 
aluminum duct tape.
10. Power up hood and check for leaks around duct tape.
11. Place telescopic duct covers onto hood and extend 
LQQHU WRS GXFWFRYHUXSZDUGVDQGVHFXUHWRGXFWFRYHU
EUDFNHWXVLQJ  0[VFUHZV5HLQVWDOOPHVK¿OWHUV
   * If using hood in recirculating mode you must secure the 
air diverter plate onto wall before installing duct work and 
GXFWFRYHUV<RXZLOODOVRQHHGWRLQVWDOOFKDUFRDO¿OWHUV
and brackets. Turn to page 10 for more details.
9-7/8”
9-
1/2
26” min.
6-
1/2
CAUTION: At least two installers are required
due to the weight and size of the hood.
!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
Cable Lock
Cable Lock
$FDEOHORFNLQJFRQQHFWRU QRWVXSSOLHG PLJKW
be required by local codes.  Check with local 
requirements and codes, purchase and install 
appropriate connector if necessary.
Installation – 
Mounting the Hood
FIG. A