Zephyr ZGEE30AS Manual De Propietario

Descargar
Página de 49
9
3/4
7”
9-
7/8”
19-
7/8”
C/L
1-
9/16”
Installation – 
Preparing the Cabinet
Fig.1
front edge
glass handle
Fig.2
1.  Determine and mark center line on wall and cabinet bottom with a pencil.
2.  If the cabinet bottom is recessed, wood blocking must be installed to ensure proper          
     alignment of the hood with the cabinet bottom.  Wood blocking should be f ush  
   
     within cabinet bottom.
3.  Follow the dimensions in Fig.1 and cut-out the bottom of your cabinet to create an opening     
     for the hood to f t through.  If you have a frameless cabinet begin the 1-9/16” measurement 
     (referenced in Fig.1) from front of the cabinet door.  This way the front edge of the hood will   
     be f ush with the cabinet doors when closed, see Fig.2.