Zephyr CCAE36ASX Manual
12
www.zephyronline.com
Installation –
Internal Blower (Horizontal Ducting)
1. Attach capacitor box to inside of hood using two
M4*10 screws included with internal blower.
2. Attach green ground wire to ground screw on
hood.
3. Connect 6 pin male connector from capacitor
box to 6 pin female connector on control board
box.
box.
4. Place solid mounting plate on top of hood and
secure using eight M4*8 screws.
5. Remove rectangular cap from back of hood.
Place six M4*8 screws aside for later use.
6. Attach blower brackets to blower as shown above
using two M3.5*10 screws for each bracket.
There are two brackets total, one for each side of
WKHEORZHU127('ULOOHGÀDQJHRIERWKEORZHU
brackets faces away from the blower casing.
There are two brackets total, one for each side of
WKHEORZHU127('ULOOHGÀDQJHRIERWKEORZHU
brackets faces away from the blower casing.
INTERNAL BLOWER PREPARATION – HORIZONTAL DUCTING