GE RAG61 Instruccion De Instalación

Descargar
Página de 60
51
Heat pump unit shall include Reverse Cycle Defrost that
automatically begins a defrost cycle when microprocessor
determines criteria for defrosting has been met.
Defrosting shall be accomplished by systematically
ceasing heat pump operation, pausing to allow internal
refrigerant pressures to equalize, then operating the
compressor with the flow of refrigerant reversed, to allow
the hot gas to flow through the outdoor coil melting the
accumulated frost. Unit shall automatically resume heat
pump operation, after pausing to allow refrigerant
pressures to equalize, at conclusion of defrost cycle.
In the event of compressor failure during heat pump
operation, unit shall automatically switch to electric
resistance heat to maintain selected room temperature
regardless of outdoor temperatures.
Unit shall have means of electrical connection listed by
Underwriters Laboratories and compatible with the unit’s
ampacity which shall conform with National Electrical
Code
®
 (NEC) and local codes.
[Internal Condensate Removal (ICR) system for Heat
Pump Units. Unit shall have a positive Internal Condensate
Removal (ICR) system to permit unit to automatically
dispose of heat pump generated condensate with no
overflow to outdoor to occur during heating under outdoor
ambient of 55°F. Dry Bulb, 90% relative humidity; indoor
ambient 70°F. Dry Bulb, 52% Relative Humidity, for four
hours of continuous run time.]
[Condensate Drain System. To remove condensate from
the wall case an (internal) (external) drain adapter shall
be installed for connection to the building condensate
drain system as shown on the plans.]
Wall Case. (Wall case shall be constructed of heavy gauge,
zinc-coated, phosphatized steel, insulated and shall have a
protective baked-on enamel finish. Bottom critical points of
the steel wall case shall be treated with petroleum
microcrystalline wax for added corrosion protection and
shall meet ASTM B-117, 1800 hour hot air aerated salt spray
test. (Wall case shall be constructed of a non-corroding glass
reinforced polyester compound.)
Cases shall be installed through exterior walls where shown
on the plans and shall be level from side to side and from
front to rear to ensure proper operation of condensate
system(s). They shall be secured to the wall at both sides
using nails or other appropriate fastening devices. In no
instance shall fasteners be used through the bottom in order
to retain the water integrity of the bottom of the
wall case.
Outside weather panels shipped with the cases shall remain
in place until the outdoor air louvers and chassis are
installed, at which time they are to be removed and
discarded by the installer.
[Sub-Base. Each unit shall have a field installed UL listed
electrical sub-base. The sub-base shall be attached to the
lower inside flange of the wall case prior to installation in
the exterior wall and shall include adjustable screws at the
bottom corners to permit exact leveling of the wall case. The
sub-base shall have side panels adjustable from a minimum
of 2 3/8" to a maximum of 13 3/4" to enclose the area
under the wall case.]
Outside Grille. Each unit shall be equipped with a standard
(Cycoloy
®
 resin architectural) (extruded aluminum
architectural louvered) (stamped aluminum) grille that has
been designed to allow unit operation in high ambient
conditions.
Special grilles or customer louver sections to be supplied by
others will conform to minimum free area requirements for
unit performance and shall be submitted to the PTAC/
PTHP manufacturer, if requested, for feasibility and airflow
characteristics.
Room Cabinet. Each unit shall have a matching, easily
removable, textured finish, wrap-around roomside cabinet
molded of high temperature styrene to resist corrosion
and damage.
Weather Resistance. Complete unit including outside louver
shall be submitted to an independent agency for weather
resistance and water infiltration tests.
Air infiltration test to be conducted in accordance with
ASTM E283-91. With static air pressure differential of 1.57
lb./ft.
2
 (.3" H
2
O) equivalent to 25 mph wind, allowable air
infiltration shall not exceed 7 ft.
3
/min.
Water infiltration test to be conducted in accordance with
ASTM E331-86 with static air pressure differential of 10.0
lb./ft
2
 (1.93" H
2
O) equivalent to 63 mph wind, 5.0 gal./ft.
2
(8" rain/ft.
2
/hr.) for 15 minutes and there shall be no
leakage into the room.
Approvals. Units shall be certified under the ARI and cUL
certification program and listed by UL.
Service. Submit complete information with bid covering
service availability, to whom service on units will be assigned,
complete address and phone number, including phone
number of emergency service personnel.
Start-Up, Adjust, Demonstrate. (Installing contractor)
(General contractor) shall be responsible for the initial
starting of units, adjustments thereto, etc., to place the units
in required operating condition. (Installing contractor)
(General contractor) shall demonstrate to the owner, or his
representative, the operation of units for both summer and
winter functions.
Warranty. The warranty shall be a full one year parts and
labor on entire unit plus an additional full four years parts
and labor for the sealed refrigerating system, including
service call for diagnosis, and transportation to and from
service shop, if necessary, at no charge to customer. The
warranty shall also include a limited 2nd thru 5th year parts
only warranty for fan motors, switches, thermostat, heater,
heater protectors, compressor overload, solenoids, circuit
boards, auxiliary controls, thermistors, Freeze Sentinel
TM
,
frost controls, ICR pump, capacitors, varistors, and indoor
blower bearing.
Installation Responsibility. Units shall be installed according
to the manufacturer’s recommendations and the
manufacturer shall not be responsible for unit failure as a
result of improper installation, or unit performance when
installed with accessories not approved by the manufacturer.