Verona VEHOOD3610 Uso Y Cuidado

Descargar
Página de 18
 
 
PREPARATION 
Use Fig. 1a and 1b on page 5 for measurements 
 
  
 
Install wood strips to level if cabinet bottoms are recessed.  
Cabinet opening for exhaust should be
:  
  6
½” diameter if using collar ONLY 
  8
¼” diameter if using collar +  6” – 7” transition    
 
 
 
 
 
 
Electrical Opening  
1 ⅞” 
  
 from Rear 
13 ⅜” from Centerline
 
Place hood under the cabinet to be installed and mark 4 keyholes           
to drill starter hole. 
Center Line