Monogram ZV925SLSS Instruccion De Instalación

Descargar
Página de 29
9
Plan the Location of the Hood and Ductwork
• Use a plumb bob to check the location. The
countertop/cooktop below the hood must be 
centered with the hood.
• The hood should extend beyond the front and rear
edge of the cooking appliance.
• The duct in the ceiling must be centered over the 
cooktop.
CONSTRUCT CEILING SUPPORT
Installation Preparation
Top view – ceiling joists parallel to front of hood
10-1/16
Install cross-framing
symmetrically over
duct/cooktop 
centerline
16
″ joist
spacing
7-1/16
8” duct
Front
of
hood
2x4 cross
framing
Cooktop
outline
Align duct 
to center of
cooktop
Ceiling Support Structure
• At the hood location, install 2 x 4 cross framing
between ceiling joists as shown. (2x4’s are required 
to support the weight of the hood.)
• Arrange cross framing in the ceiling to suit the 
existing structure.
• Your ceiling joists will be like one of the following 
examples.
EXAMPLE A
Ceiling
Hood
ducting
centerline
Cooktop
Countertop
Front
27-9/16
13-3/4
Side view
Align with
center of
cooktop