Cisco Systems 7326 Manual De Usuario

Descargar
Página de 182
 
Chapter 2      Preparing to Install the Wide Area Application Engine
  Safety Guidelines
2-6
Cisco Wide Area Application Engine 7326 Hardware Installation Guide
OL-6831-02
To help protect your system components from sudden, transient increases and 
decreases in electrical power, use a surge suppressor, line conditioner, or 
uninterruptible power supply (UPS).
Position cables and power cords carefully; route cables and the power cord 
and plug so that they cannot be stepped on or tripped over. Be sure that 
nothing rests on your system components’ cables or power cord.
Do not modify power cables or plugs. Consult a licensed electrician or your 
power company for site modifications. Always follow your local or national 
wiring rules.
System Reliability Considerations
To help ensure proper cooling and system reliability, make sure the following 
occurs: 
Each of the drive bays has either a drive or a filler panel installed.
Each of the power-supply bays has a power supply or a power supply filler 
panel installed.
For rack configurations, make sure that space is available around the 
appliance to enable the cooling system to work properly. See the 
documentation that comes with the rack for additional information.
The appliance cover is in place during normal operation.
The air baffle cover over the microprocessors remains closed during normal 
operation.
The air baffle is installed between the fans and the power supply.
A removed hot-swappable drive is replaced within 2 minutes of removal.
Cables for optional adapters are routed according to the instructions provided 
with the adapters.
A failed fan is replaced within 48 hours.
The appliance is powered down and the power cords are disconnected before 
you open the air baffle cover.
The air baffle assembly is always installed in the appliance except when you 
are installing or removing the components that are located under the air baffle 
cover.