Meridian Data 16i Manual De Usuario

Descargar
Página de 91
Chapter 4: Subsystem Connection and Operation 
  
4-5 
 
 
Figure 4 - 2: Sample Topology: Connection and Host LUN Mapping 
 
 
4.3  Power On 
Once all the components have been installed in the EMD subsystem, the iSCSI ports have been connected 
to the network, power on the network devices, the subsystem, and then power on the servers/iSCSI 
initiators.