Hobart ML-130250 Manual De Usuario

Descargar
Página de 44
– 7 –
7.  Remove any packaging, tape, wire and bracing from each section. Remove all 
rear and lower panels.
8.  Verify that shipping tape has been removed from all floats in each tank and that
the floats are free to operate properly.
NOTE: Do no throw out any loose parts. These may be required for installation 
or operation.
LOCATION
Allow adequate space for machine installation and operation. Place the machine 
sections close to their final position. Allow space to work on the ends of the center
section.
Review, but do not remove tags or labels. Remove tags after installation is complete
Positioning the Center Section
Use a chalk line on the floor to align the machine along its complete length.
With each section in its approximate final position, determine which section is at the
high point in the floor.
Machine assembly begins after the center section has 
been leveled to a height that compensates for the floor height of the other 
sections.
Leveling the Center Section
Leveling is an important installation function because it could affect door operation 
and cause leaks once the machine is operating.
•  Level the center section along its length by opening the doors and placing a 
level between the doors along the tank support rail (Fig. 2). Do not check level 
on top of doors. Adjust the feet in or out as required to level.
Fig. 2