Aprilaire Freezer PLUS Series Manual De Usuario

Descargar
Página de 15
 
1
 
SPECIFICATIONS: 
 
 
 
Enzyme/Manual Defrost Freezer PLUS Series 
  
  
  
Inner  
  
Usable Int. Dim. Ext. Dim. 
  
  
  
  
Ship
Model Cu.Ft. 
Doors 
Doors/Drawers Shelves 
W" 
D" 
H" 
W" D" H" 
H.P 
Amps 
BTU/hr 
Ibs
Ibs 
MFP-0920 
1 swing 
5/2 
6 fixed 
16 
16  50  22 24 64*  1/6 
850 
136 176 
MFP-2020 
20 
1 swing 
5/0 
4 fixed 
27 
18  57  32 29 77*  1/4 
770 
315 355 
MFP-2030 
20 
1 swing 
5/0 
4 fixed 
27 
18  57  32 29 77*  1/4 
770 
315 355 
MFP-2920 
29 
1 swing 
5/0 
4 fixed 
32 
26  65  35 32 84*  1/3 
2174 
328 368 
MCFP-1520 
15 
1 swing 
N/A 
2 baskets 
42 
24  28  48 30 35*  1/4 
770 
191 231 
MCFP-2020 
20 
1 swing 
N/A 
2 baskets 
56 
24  28  62 30 35*  1/4 
770 
220 265 
 
RECEIVING 
 
A. LRP ships by carriers that we have used for many years and have selected for their good service, 
but accidents in shipping occur regardless of how much care is taken.  Therefore the following is 
very important: 
 
B.  Inspect unit at once for any shipping damage, including concealed damage. 
 
C.  You should check for any shipping damage immediately, preferably before the carrier leaves 
your receiving dock, as nearly all shipments are FOB ship point. 
 
D.  If there is any damage, note it on the carrier's receiving documents and notify the office of the 
carrier immediately. 
 
E.  The responsibility of the shipper and the delivering carrier ends five days after goods are received.  
It becomes the responsibility of YOU, the customer, to unpack the unit and check for concealed 
damage caused during shipping.  Immediate attention should be given to this. 
 
F.  Retain all packing materials if damage is found. 
 
INSTALLATION AND STARTING INSTRUCTIONS 
 
LOCATION – This unit requires a minimum of 4 inches of air flow in back and 1 to 2 inches on the sides 
and top.  Leveling legs are required in front only.  Unit may have a slight tilt from front to back after 
legs are installed.  This is acceptable and is recommended on this unit. 
 
POWER SOURCE – The supply circuit to this cabinet must conform to all National and Local Electrical 
Codes.  Consult the cabinet Serial-Data plate for voltage, cycle, phase, and ampere requirements 
before making connection.   VOLTAGE SHOULD NOT VARY MORE THAN 5% FROM SERIAL 
PLATE RATINGS.  A separate circuit is recommended to prevent possible loss of product due to 
over-loading or failure of other equipment on the same circuit.  PROTECT THE CIRCUIT WITH A 20 
AMP DELAY-TYPE FUSE.   
 
STARTING – There are no compressor shipping bolts to loosen or valves to open.  All that is necessary 
after the freezer has been properly leveled is to plug the service cord into an electrical outlet.  Do not 
use an extension cord.  Be sure your freezer is properly grounded.  Use the 3-prong plug provided 
into a 3-prong grounded outlet.   (Only this method complies with national electrical codes, local 
codes and ordinances.)  Unless the above grounding method is followed, you are not protected 
against severe or lethal shock in the event of a short circuit of an electrical component or wiring of the 
freezer.  When starting this new appliance, allow the cabinet to operate a minimum of three hours or 
until it has started cycling normally before placing product in the cabinet.  The motor compressor may 
start and stop several times when the unit is first started or after defrosting, especially if the weather 
is very hot.  This is only normal functioning of the motor overload protector.  The motor compressor 
will cycle normally as soon as the excess heat has been removed.