Bunn CDBC-TS Manual De Usuario

Descargar
Página de 32
Page 21
BUNN
MA
NU
FA
CT
UR
ED
 B
BU
NN
-O
-M
AT
IC
 C
OR
PO
RA
TIO
N
    
    
    
    
   S
PR
IN
GF
IE
LD
, IL
LIN
OI
S,
 U
.S
.A
.
MO
DE
L
S/
N
VO
LT
 A
.C
.   
    
     
     
   A
MP
    
    
     
     
W
AT
TS
PH
AS
    
     
     
     
    
    
 W
IR
     
     
     
 H
ER
TZ
    
     
     
CO
VE
RE
D U
ND
ER
 O
NE
 O
MO
RE
OF
 TH
E F
OL
LO
W
IN
G P
AT
EN
TS
 :
ON
OR
 M
OR
E O
TH
ER
 P
AT
EN
TS
 M
AY
 B
PE
ND
IN
SERVICE (cont.)
CONTROL BOARD - Model CDBC-APS/TS/TSR
Location:
 The Control Board is located inside the top cover
behind the front end cap.
Test Procedures:
The test procedures for the control board will vary
depending  upon  the  problems  experienced  by  the
brewer. Refer to the Troubleshooting guide beginning
on page 9. The troubleshooting guide is divided into
three sections, Refill Circuit, Heating Circuit, and Brew-
ing Circuit.
P1914
FIG. 2 CONTROL BOARD
Removal and Replacement:
1. Disconnect the black wire and blue wire from the
relay on the control board.
2. Disconnect  the  10-pin  connector  and  the  4-pin
connector from the main wiring harness.
3. Disconnect the 11-pin connector from the control
panel.
4. Remove the four #6 screws and four nylon wash-
ers and the two #4-40 screws securing the control
board to the end cap assembly.
5. Install a new control board and secure with the
four #6 screws and nylon washers and the two #4-
40 screws to the end cap assembly.
NOTE: The four nylon washers must be installed
under the heads of the four #6 screws to prevent
a possible shorting of the control board circuits.
6. Connect  the  11-pin  connector  from  the  control
panel.
7. Connect the 10-pin connector and the 4-pin con-
nector from the main wiring harness.
8. Connect the blue wire and black wire to the relay on
the control board.
9. Refer  to 
CDBC-APS/TS/TSR  Adjustments  and
Optional  Settings  to  program  the  new  control
board.
29253 011900