Cabletron Systems NB20E Manual De Usuario

Descargar
Página de 30
 
3-1
 
CHAPTER 3
INSTALLING THE NB20E OR NB25E BRIDGE
 
This section contains instructions for installing Cabletron Systems' 
NB20E or NB25E Two Port Ethernet Bridge, and for preparing the bridge 
for operation. Verify that all network design guidelines and site 
requirements listed in Chapter 2, 
 
Installation Requirements/
Specifications
 
,
 
 
 
are met before installing the bridge. 
 
3.1
UNPACKING THE NB20E OR NB25E BRIDGE
 
Before you install the NB20E or NB25E Bridge, you should visually 
inspect the bridge and check the contents of the accessory package. To 
unpack the bridge and accessory package:
1. Carefully remove the bridge from the shipping box. Save the shipping 
box and materials in the event the unit has to be reshipped.
2. Slide the two foam end caps off of the bridge and remove the bridge 
from its protective plastic bag. Set the bridge aside to prevent the unit 
from being damaged.
3. Remove the plastic bag containing the accessory package and check 
that the bag contains the following items:
one 8 foot (2.44 m) power cord
one cable support bracket
two 8-32 x .375 inch screws
three 6 (15.24 cm) inch cable ties
rack mount brackets
Contact Cabletron Systems' Technical Support immediately if any 
discrepancy in materials exists.
 
3.2
INSTALLING THE  BRIDGE
 
After you have met all requirements listed in Chapter 2, 
 
Installation
 
 
 
Requirements
 
, complete the installation instructions provided in this 
section.