Cabletron Systems NB20E Manual De Usuario

Descargar
Página de 30
 
INSTALLING THE NB20E OR NB25E BRIDGE
3-5
 
Figure 3-4
 Bridge Front Panel
 
3.2.5
Connecting The NB20E or NB25E To The Power 
Source
 
When installation of the NB20E/NB25E Bridge is complete and the 
switches have been set, connect the bridge to the power source in the 
following manner:
1. If you have not already done so, plug the power cord (7, Fig. 3-3) into 
the power receptacle (6) located on the rear panel of the bridge.
2. Plug the power cord into a wall receptacle.
3. Turn the power switch, located next to the power receptacle, to the on 
position.
4. Observe the status of the ON-LINE, STANDBY, PORT 1 OK and 
PORT 2 OK LEDs. These LEDs will flash for approximately 10 
seconds as the bridge performs it's internal diagnostics.
When the bridge finishes its internal diagnostics, the LEDs should be 
in the following conditions:
ON LINE LED lit, indicating that the bridge is receiving power.
PORT 1 OK and PORT 2 OK lit, indicating that the ports have 
passed the internal loopback test and are now ready for 
transmission.
STANDBY on or off, depending on the bridge's position in the 
Spanning Tree Algorithim.
NB-25E
ETHERNET /IEEE 802.3 BRIDGING UNIT
WITH REMOTE LANVIEW® AND MANAGEMENT
XMT
RCV
CP
POK
PORT
1
2
1
1
0
0
ON LINE
STAND BY
FORWARD
BROADCAST
ROOT