Cabletron Systems NB20E Manual De Usuario
INSTALLING THE NB20E OR NB25E BRIDGE
3-5
Figure 3-4
Bridge Front Panel
3.2.5
Connecting The NB20E or NB25E To The Power
Source
Source
When installation of the NB20E/NB25E Bridge is complete and the
switches have been set, connect the bridge to the power source in the
following manner:
switches have been set, connect the bridge to the power source in the
following manner:
1. If you have not already done so, plug the power cord (7, Fig. 3-3) into
the power receptacle (6) located on the rear panel of the bridge.
2. Plug the power cord into a wall receptacle.
3. Turn the power switch, located next to the power receptacle, to the on
position.
4. Observe the status of the ON-LINE, STANDBY, PORT 1 OK and
PORT 2 OK LEDs. These LEDs will flash for approximately 10
seconds as the bridge performs it's internal diagnostics.
seconds as the bridge performs it's internal diagnostics.
When the bridge finishes its internal diagnostics, the LEDs should be
in the following conditions:
•
ON LINE LED lit, indicating that the bridge is receiving power.
•
PORT 1 OK and PORT 2 OK lit, indicating that the ports have
passed the internal loopback test and are now ready for
transmission.
passed the internal loopback test and are now ready for
transmission.
•
STANDBY on or off, depending on the bridge's position in the
Spanning Tree Algorithim.
Spanning Tree Algorithim.
NB-25E
ETHERNET /IEEE 802.3 BRIDGING UNIT
WITH REMOTE LANVIEW® AND MANAGEMENT
XMT
RCV
CP
POK
PORT
1
2
1
1
0
0
ON LINE
STAND BY
FORWARD
BROADCAST
ROOT