Goodman Mfg GAS-FIRED WARM AIR FURNACE Manual De Usuario

Descargar
Página de 56
22
A
LTERNATE
 V
ENT
/F
LUE
 D
RAIN
 H
OSE
 C
ONNECTIONS
Upright installations using the alternate vent/flue outlet will require
“right-side only” drain hoses to be connected as follows.  Refer to
Vent/Flue Pipe and Combustion Air Pipe for details on alternate
vent/flue pipe connection.
1. Remove the rubber plug from the right-side drain port on
the front cover . Save for use in step 3.
2. Secure Hose A to front cover drain port with a red hose
clamp. Route hose to rear right side panel grommet hole.
3. Remove grommet from front right-side panel drain hole.
Seal hole in grommet with large end of plug.  Reinstall
grommet and plug into side panel drain hole.
4. Cut 1/4 inch from the end of the drain port on the externally
mounted rubber elbow.  Discard cut portion.
5.
Insert Tube 1 into rubber elbow drain port and secure with a
silver hose clamp.  Angle tube toward trap.
6.
Cut 17 3/4 inches from the long end of Hose B and discard.
7.
Secure straight end of Hose B to exposed end of Tube 1
with a green hose clamp.  Route hose toward right side
panel grommet holes.
8.
Insert short end of one Tube 2 through rear right side panel
grommet drain hole.  Secure tube to Hose A with a green
hose clamp.
9.
Insert short end of remaining Tube 2 into Hose B from
rubber elbow and secure with green hose clamp.  Ensure
hoses and tubes maintain a downward slope for proper
drainage and are not kinked or binding.
Upright “Alternate: Connections - Right Side Only
(Upflow Shown, Counterflow Similar)
RUBBER ELBOW
(EXTERNALLY
MOUNTED)
TUBE 1
GREEN HOSE
CLAMPS
(3 PLACES)
HOSE B
TUBE(S) 2
DRAIN TRAP
HOSE A
FRONT
COVER
DRAIN
PORT
RUBBER
ELBOW 
DRAIN PORT
RED HOSE
CLAMP
SILVER HOSE CLAMP