Roberts Gorden UHD[X][S][R] 125 Manual De Usuario

Descargar
Página de 54
 UHD L
OW
 P
ROFILE
 D
UCT
 F
URNACE
 I
NSTALLATION
 O
PERATION
 
AND
 S
ERVICE
 M
ANUAL
36 
14.2 Burner Compartment
14.2.1 Burner Injectors
Remove flexible
air duct from spigot 
Viewing port
for flame probe
Flame Probe 
Burner
Compartment
Cover 
Ignition Electrode 
Remove screws and
pull off burner cover
NOTE:  Separated combustion    
 model 
shown.
The burner compartment is a sealed 
compartment. Following any work, 
re-seal the compartment with the 
gas pipe rubber seal fully in place 
and all screws fitted and tight.
MODEL
UHD[X][S][R] 75
UHD[X][S][R] 100
UHD[X][S][R] 125
Orifice Quantity
5
6
7
 Natural Gas (G20)
Orifice Marking
49
46
46
P/N
91930049
91930046
91930046
 Propane (G31)
Orifice Marking
1.15 mm
1.25 mm
1.25 mm
P/N
91930115
91930125
91930125
Remove manifold
screws and pull
out manifold
Manifold
Inshot
Burners
Orifices
Manifold
Mounting
Bracket
Grommet
Unscrew
Orifices
Manifold
Marking
Folded
Hem
          Ensure gas tight fitting 
          of injectors.
Ensure correct alignment 
with burners.
Ensure all pipe joints are 
gas tight.