Roberts Gorden UHD[X][S][R] 125 Manual De Usuario

Descargar
Página de 54
SECTION 14: R
EPLACEMENT
 P
ARTS
39
14.6 Pressure Switch
Pull off 3 way connector. Spring open plastic clips of mounting cradle. Replace with correct type of pressure 
switch for model. The pressure switches are color coded for each pressure setting.
Carry out a start-up after working on or changing a pressure switch. See Page 23, Section 10.
14.7 Ignition Control
The control mounts to the heat exchanger plate. Pull out ignition cable and wiring from board, noting their 
positions. Release the four mounting standoffs. Refit in reverse. Ensure correct location of ignition cable 
and all other wiring.
14.8 Limit Switches
14.8.1 Removal and Replacement
1. Remove the electrical connections to the switch.
2. Unscrew the two screws securing the switch.
3. Fit a new switch with two screws.
4. Reconnect the electrical connections and test operation.
MODEL
UHD[X][S][R] 75
UHD[X][S][R] 100
UHD[X][S][R] 125
Pressure Switch Kit P/N
90439810
90439810
90439803
Color Code
black
black
gray
Set Point in wc
.35
.35
.41
Pressure Switch Snap Ring P/N
90439850
90439850
90439850